Goal-Oriented Project Management
Register free

How to Prevent Project Overrun: 8 Decisive Tips

Vlad Kovalskiy
November 17, 2022
Last updated: January 17, 2024

Table of Contents

8 Strategies to Avoid Project Overrun
  1. Never begin a project without first conducting a cost analysis
  2. Conduct a risk analysis and document every process
  3. Create a resource management strategy
  4. Include a buffer in the estimations
  5. Utilize technology to monitor a project overrun
  6. Promote collaboration through communication
  7. Spend in training
  8. Prepare for adversity
FAQ

The lack of clearly outlined project targets and milestones causes 37% of projects to fail, according to research done by the Project Management Institute. Any project can experience cost overruns, but software development, manufacturing, and building projects are the ones that experience it most frequently. A project cost overrun, sometimes referred to as a cost increase or project budget overrun, can occur because of cost mismanagement or project delays.

The craftsmanship of project management is arduous to optimize. Some initiatives run above scale, budget, and time constraints. Even though the variables that affect costs, schedules, and deliverables vary from task to task, being aware of the probable causes of cost overruns puts you in a clearer perspective to stop them. 

8 Vital Strategies to Avoid Project Overrun

1. Never begin a project without first conducting a cost analysis

The greatest strategy to prevent a project overrun is to carry out a cost analysis prior to a project being started. By doing so, you'll be able to maintain command over the project's finances and other risk concerns. Make an initial evaluation of the cost projection to start carrying out a cost analysis. Whether any areas have been overlooked, this needs to be taken care of right away.

Another thing to do is to list every single component that will be applied to the project. The resources could be manpower, machinery, supplies, etc. Each of these will affect how much the project will cost overall. 

In order to have enough time to monitor the development and determine how much work remains, establish an achievable target date for the conclusion of the project. Failing to establish ample time for monitoring may result in a deadline extension could further increase project costs. A manager can begin the project after gaining a clear understanding of everything that must be accomplished and the amount it will potentially cost.

2. Conduct a risk analysis and document every process

Every undertaking involves some level of risk. However, the less probable you are to falter, the better equipped you should be for challenges. Whenever partners, funders, and perhaps even project managers make overly optimistic projections and believe that everything will go according to plan, the danger of project overrun increases. Among the biggest causes of project disaster and expense overrun is naivete. Therefore, companies must carry out a complete study that will enable them to determine the risk exposure. Create a risk mitigation plan and consider how to counteract the dangers. In addition, they should also create a risk response strategy to prevent project damage.

It is imperative to keep records. Without one, you'll be prone to error. It serves as the major source of project-related information and maintains stakeholders informed. This is why it's important to record the procedure:

  • Clarifying the project's scope with each participant's duties, goals, objectives, design development, funding, and deadlines will be helpful.
  • Documentation can be used in risk management.
  • If partners and clients desire to make adjustments, this informational record might assist in defending the original budget and range.
  • Maintaining conformity with legal and financial laws is made easier by documentation.
  • It assists in determining the project's viability and whether they should keep working on it.

3. Create a resource management strategy

Making an optimal resource management strategy is necessary to guarantee that you have enough assets to convey the whole project's goals. Such a plan's ultimate objective frequently involves making the best utilization of the resources at hand while also cutting expenses by discontinuing pointless or unproductive processes. The first stage in developing a successful resource management strategy for a project is to determine the accessibility of resources and assign individuals to tasks in accordance with their capacities and expertise. After that, project managers should calculate how lengthy you'll require every resource to prevent project overrun.

All the resources required to accomplish the targets should be explicitly stated in the strategy. Three divisions can be made from the necessary resources. As follows:

  • People - It includes human resources, expertise, knowledge, experience, etc.
  • Machines - Such as computers, phones, and automobiles.
  • Money - Among the most crucial things required to successfully operate a firm and conduct a project is financial capital.

4. Include a buffer in the estimations

A reserve of construction resources is maintained on board as a buffer stock to prevent any unanticipated inventory deficits prior to manufacturing. When determining how much buffer stock to have on hand, it's important to weigh the expense of the excess inventory versus the duration of operational stoppage that the excess inventory prevents.

No matter whatever approach a business uses to determine the ideal buffer stock levels, companies must have recourse to reporting and analytics tools that assist businesses to manage inventory by giving them access to past transaction data, SKU efficiency analytics, and demand predictive modeling. To streamline stock storage and guarantee demand fulfillment on time, anyone can quickly calculate the ideal quantity of buffer inventory with the proper type of information at their disposal.

Numerous studies have shown that people frequently overestimate how much they are capable of achieving. Due to this optimistic tendency, the actual amount of time needed to complete the task is underestimated, which causes abrupt events. The early projections may be a little bit unrealistic too though. Because of this, it's crucial to factor in buffers when estimating costs, setting aside extra periods and funds for the project's initial expenditure. The ideal approach is to increase the scope of the project by a minimum of 10%. Some projects even go by 15% up to 20% buffer stock depending on the capacity of the companies or clients.


Prevent Project Overrun With Bitrix24 

Unlimited Users Free

Register Today


5. Utilize technology to monitor a project overrun

Various solutions can be used to stop project cost overruns. Among the most common is time tracking software, which assists in monitoring performance, real-time budget control, and cost tracking between expected and actual amounts. It incorporates components of activity, task management, and accounting systems to make it simple to keep track of costs throughout the project duration.

Additional tools are also available for use:

  • Accounting software can assist you in managing intricate financial difficulties.
  • Planning software facilitates the visualization of periods and the development of an appropriate timetable
  • Software for risk management is needed to conduct risk assessments and track project dangers.
  • Data-collecting software is needed to compile all the project-related statistics and display them.
  • Tools for collaboration can improve teamwork on the project.
  • Communication applications end up making it simple to connect with everybody participating in the project throughout all stages and spread information.

The majority of these instruments can be used with one another, while some can be used independently or have numerous functions. Make an informed decision and select the solutions that best meet your company's requirements.

6. Promote collaboration through communication

Collaboration benefits through communication. It aids in maintaining agreement among all parties and ensures that the project is free of flaws. The entire team needs to be involved in the communication, particularly when it pertains to budget planning. This includes the customer, project funders, members of the team, and other interested parties. Each viewpoint of these individuals can contribute useful facts.

Depending on the collective experiences or internal databases, members can all offer estimations or estimated charges for the proposed project's scope of work. Furthermore, it is essential to consider everyone's objectives, how they connect to one another, as well as whether they exclude or clash with one another. Doing these activities is needed to avoid project overrun in project management.

Regular consultation audits and honesty are further components of communication and collaboration. The workflow documentation must be uniform and comprehensive in this case. It will serve as a point of reference for the business and the team, as well as the client and other project participants.

7. Spend in training

When the timetable and equipment are ready, it's vital to concentrate on the people element. Another of the key success factors is having the right training to complete projects on schedule and within budget.

Two incredibly dissimilar yet closely related subject areas should be covered in the training. One aspect of it is teaching building project employees how to utilize the machinery, supplies, and materials they will be using in the field. Alternatively put, instruction in manual building force prior to the start of the project, there should be training that places a special emphasis on cooperation and protection.

Another smart move to prevent project overrun is to ensure that the team includes some seasoned professionals who could be role models for the other men working on the project site. On the contrary, all project participants need to receive in-depth training in how to employ the software tools that are planned to utilize respectively onsite and offsite. Perhaps you'll be able to maximize the potential of the technological solutions the team has chosen. 

8. Prepare for adversity

Changes are unavoidable, and excellent project administrators are cognizant of this. If otherwise, they are in the incorrect line of work. They also understand that unplanned adjustments are frequently the cause of projects going over budget.

A project's scope has not ever been set in stone. Regardless of how clear the range and demands are, modification frequently occurs even before writing the statement of work has even finished. Learning to embrace change and live in peace with it is something everyone can start doing right off the bat.

Every time there is a need for modification, it is your responsibility as the project leader to keep an eye out for calls for alteration, address the set of circumstances, and ensure good administration. Keep in mind that each and every change must be supported by data demonstrating its necessity and its relevance to the project. Strategies for managing change should be created beforehand, and you probably have put them in existence. Take into account and create situations for how else you can react to changes if you choose not to.

Final Thoughts on Different Decisive Tips to Avoid Project Overrun in Project Management

Completing client projects and understanding what cost overruns are is a difficult task. The major benefit is that you can have a substantial edge over your competitors if you have a thorough plan and use trustworthy digital technology or tools like Bitrix24. It is a centralized work platform that oversees all aspects of project operations and responsibilities for your company's efficient management.

FAQ


What are cost overruns?

Cost overrun or project budget overrun is referred to as unanticipated expenses that cause a project's budget to be exceeded. This results in a shortfall in the project's funding requirements and can lead it to stall or stop the entire project which may cause further problems.

How to mitigate cost risk?

There are several ways to mitigate cost risk:
  • Conducting a cost analysis.
  • Conduct a risk analysis and document every process.
  • Create a resource management plan.
  • Always include a buffer stock.
  • Utilize technology.


Free. Unlimited. Online.
Bitrix24 is a place where everyone can communicate, collaborate on tasks and projects, manage clients and do much more.
Register free
You may also like
Boost Productivity
What is Time Blocking and How Can It Boost Your Productivity?
Boost Sales with CRM
Bitrix24 and Trello: Head-to-Head in Task Management Efficiency
High-performance teamwork
6 Ways to Foster Employee Collaboration without Physical Meetings
Boost Productivity
10 Keys to Overcome Work Anxiety in the Workplace
We use cookies to enhance your browsing experience - Find out more. You are now on the lite version of the page. If you'd like to find more information about our cookies policy, please go to the full version of the site.